risk assessment of the machine factory assembled and EC import
Question: I
Bisignano a straight on the machine directive. I work in an incinerator that burns waste to generate electricity. A similar plant is under revamping and we bought some new machines that we have assembled to form the plant. Now we do risk assessment of the new machine (the assessment required for the RES of course) and the question arises how "marked" and how to manage the CE . What we would like to understand (and I wish I helped them to understand) and if I must certify the new CE machine or just compile a technical file and test that I have to decide where to begin and where does the machine inside the plant.
Answer Hello.
You are fully in at least 2006/42. But maybe not all: EMC? LVD? For sure.
You must make the declaration of conformity for all applicable on!
and satisfy all conditions (RESS) of All The New Approach Directives.
From what you write, "CE mark" the whole (the system), not just the machines or parts
... It must do all those who put in operation. Required by Article 3 D already Decree 17/2010. So
risk assessment to ISO 14121, with risks from hazards + 2 + 1 and ISO 12100 type C standards exist.
probably validate the system of controlling the system with the ISO 13489 (attached for convenience). So all material
bands. Techn. eg. All of VII Dir M. to put together. So
and maintenance manual (which is part of the beam. Technical and done as par. 1.7.4 All I, for starters).
All necessary and required. With
person authorized to appoint the technical band.
Call me if you need clarification.